Pool Floor nearly completed

As you can see from this picture, much of the pool floor is poured. The section on the left side of the picture will be poured Thursday and then it will be time for the stainless steel gutter to be put on around the pool. This is a custom job that will take at least a week. According to Christiansen Construction, after this the last section of the pool floor at the zero entry will be poured. Quite a bit of sand is packed around the outside walls of the pool and more dumptrucks full of dirt have been hauled off again this week. No progress on the bathhouse yet as they are waiting until the dirt is packed around the pool and the ground is stable.